August 2010 Newsletter

Friends:

We are still working on the 8000 square foot barn in Harmony .  The windows are in, stucco well on the way ready for doors and finishes.  We are ordering the timber for the Japanese shrine soon.

The design of the home in Kensington is coming along, waiting in architectural review.  We have a truss project coming up in Arroyo Grande end of September.   Also coming up are SIP projects in Atascadero and Nipomo.  The 1200 square foot patio cover in Glendora is being delivered tomorrow and we will be on site there for two or three weeks.  The design for the project in  Morgan Hill is also moving along.

Please let us know if you would like information on any of these projects.

June 2010 Newsletter

Friends:

We are working on the 8000 square foot barn in Harmony .  The timber framing is complete and the SIPs are installed.  We are ordering the timber for the Japanese shrine soon.   

The south-west home in San Miguel  in almost completed.  The last of the cabinets by Rich Gardner are almost finished.  

The design of the home in Kensington is well on the way and construction is planed for  summer 2010.  The truss project in Paso Robles went without a hitch.   Also planed for summer 2010 are two small SIP homes in Santa Barbara, a 1200 square foot patio cover in Glendora and  a project in  Morgan Hill.

Please let us know if you would like information on any of these projects.

May 2010 Newsletter

Friends:

We will be at the San Luis obispo home show May 15th & 16th, With lots of information about Premier SIPs and traditional timber framing. Please stop by if you are the area. 

We are on site at the 8000 square foot barn in Harmony and all of the timber framing is complete.  We are starting the roof decking, SIPs and detailing this month.   

The stairs in the south-west home in San Miguel  are completed, photos coming soon.  The last of the cabinets by Rich Gardner will be installed this month and the project will be complete.  

The design of the home in Kensington is well on the way and construction is planed for spring / summer 2010.  The truss project in Paso Robles will be done at the end of the month. The pool side pergola in Pacific Palisades  is completed.  Also planed for summer 2010 are two small SIP homes in Santa Barbara, a 900 square foot patio cover in Glendora and  projects in Carpenteria, and Morgan Hill.

Please let us know if you would like information on any of these projects. 

 

March 2010 Newsletter

Friends:

We will be at the Santa Barbara Earth Day Festival at the Green Home Pavilion April 17th & 18th, We will have a sample 4′ x 8′ Premier SIP on display and lots of information about Premier SIPs. please stop by if you are the area. 

We are on site at the 8000 square foot barn in Harmony and the second floor and lower roof timbers are in and the second floor decking is in.  We will start on the upper timber structure next week.  

We are finishing the stairs in the south-west home in San Miguel  this week.  The cabinets and doors by Rich Gardner have been installed and the floors and painting are finished.  

The design of the home in Kensington is well on the way and construction is planed for spring / summer 2010.  We are starting a truss project in Paso Robles soon and a pool side pergola in Pacific Palisades.   Also planed for summer 2010 are a 900 square foot patio cover in Glendora and  projects in CarpenteriaMoorpark and Morgan Hill.

 

February 2010 Newsletter

Friends:

   The SIP and Timber Los Olivos guest house is complete and move in was last week.  The general contractor, Rob Davidson, did a great job with the finish of the home.  

We are on site at the 8000 square foot barn in Harmony and timber will be going up soon.  The construction is Port Orford cedar timber framing, ICF walls and SIP roofs.  

The finish for the south-west home in San Miguel  is proceeding and will be occupied soon.  The cabinets and doors by Rich Gardner have been installed and the floors and painting are finished.  

The design of the home in Kensington is well on the way and construction is planed for spring / summer 2010.  Also planed for summer 2010 are a 900 square foot patio cover in Glendora and  projects in CarpenteriaMoorpark and Morgan Hill.

January 2010 Newsletter

Friends:

We have delivered the timber for the 8000 square foot barn in Harmony and as can happen, it is a little behind schedule.  Now that timber is on site we are having the heaviest rains here in years.  We are hoping and planing to be working on site next week.  Our work on the south-west home in San Miguel  is finished except for the stairs.  The custom doors by Rich Gardner have been installed and the floors, cabinets and finishes are under way.  The design of the home in Kensington is well on the way and construction is planed for spring / summer 2010.  Also planed for summer 2010 are projects in Carpenteria, Moorpark and Morgan Hill.

August 2009 Newsletter

Friends:

We are currently working on an 800 square foot guest house in Los Olivos , it is a SIP building with a timber frame screen porch and interior timber truss.  We are now cutting the screened porch in the shop.  The SIPs will be delivered the first week of August and will be installed along with the timber in August.  If you would like to visit while the SIPs are being installed please contact us.  We also have timber in the shop for an 8000 square foot barn in Harmony it will be built over the summer and fall.  Our work on the south-west home in San Miguel  is almost finished.  The guest house is complete and the client in moved in.  All of the framing and timber work are complete, windows and doors are installed, dry wall is hung and taped, and the custom doors by Rich Gardner will be installed soon.  We will soon be starting design on a home in Kensington and we are working on a design for two pergolas in Calabasas.

If you are in the area come see us at the Paso Robles Home Show  August 29th & 30th

2009 Home Shows

This year Pacific Post and Beam will be at few home shows here in California.  If you are interested in meeting us or gathering more information about Pacific Post & Beam, timber framing or structural insulated panels (SIPs), please consider dropping by and saying hello.


April 18th & 19th
Monterey County Home Show
Monterey Fair Grounds


May 1st
Reedley College Green Summit


May 16th & 17th
San Luis Obispo Home Show
Alex Madonna Expo Center


August 29th & 30th
Paso Robles Home Show
Paso Events Center


March 2009 Newsletter

Friends:
Our eclectic south-westen style project in San Miguel is progressing nicely.  The guest house is near completion and the second floor hip roof framing has been completed.  Tomorrow, March 24th, we will be setting the great room trusses after which the remaining timberframing to be installed is the wrap-around porches and entry porch.

Our work is complete in Coarsegold and look forward to seeing finished photos as the owner takes the project to complettion.

Upcoming projects are located in Harmony, Moorpark, Malibu, Carpenteria and Portola Valley.

Please contact us if you would like more information about these projects.